Flooded Four-story Apartment Building
5/13/2019 (Permalink)
A plumbing line malfunction on the 4th floor of this under-construction apartment complex caused flooding from the 4th floor all the way down to the 1st floor garage area. After only 12 hours of water migration, the water had already affected insulation, drywall, kitchen cabinets, and flooring throughout 12 separate units.
SERVPRO of Rockwall/Rowlett was called upon to dry out the structure. The picture shows our response team vehicles in front of the damaged structure. We immediately deployed our crews and provided a one-hour response time, eliminating further water migration and secondary damage to the building.
The contractor was thrilled and he said "We were very impressed with the response time of the crews and how well they took control of the situation."